Saturday, July 25, 2009

Update tomorrow....

I went out today and rounded up the fittings, hose and such that I need to complete the pumbing of the fuel pressure gauge, boost gauge, wastegate hose, and boost reference for the fuel pump. Look for an update tomorrow...

Sunday, July 19, 2009

Back in the Saddle...

Ok so after a short hiatus from the truck (reason: see previous post) I got some work done on the truck today.

First I fixed the electrical issue (see: not very electrifying) ...turned out to be a bad ground...so the pump has got juice. (note: bought a nice new test light at Loop Road - still down one multimeter)

Next, I welded up the rest of the the merge pipe. I ran by RJ's custom piping in Raleigh and picked up the 90 degree pipe I needed. It had all been mocked up and tacked...so I did the "real" welds. I had little scare in the middle of it...my welder just stoppped...dead. Oh, crap. It turns out it just overheated...after cooling down for a while it started working again...whew. Anyway, done.


I also removed the mechanical fuel pump and built the drain to replace it. I fuel pump block off plate that I drilled and welded a bung to and threaded in a 5/8 fitting.


Finally I had an issue when I added the drain to the turbo...it hit the bracket I had made....so I had to rejigger the bracket (note the cut and reweld in the bottom bracket below) to clear the drain and it was just tacked as well...so I burnt some metal there too. I then painted up all the crap I built or modified before putting it all back in...

Sunday, July 5, 2009

No work = Lots of Work

Well, I haven't got much done on the truck the last few weekends...why? The wife's Wagoneer blew a head gasket...so I got to tear into the 360...so, here it is: "How to replace head gaskets in 30 seconds or less!"

Sunday, June 14, 2009

Not very electrifying.

I didn't get much done today...I did get the fuel pump wired up...but then got a visit from a Mr. Murphy something about a Law.

...I get the pump wired...hook the battery up...Nothing. Dead. I appearently have a short somewhere ...no problem...I pull out my multimeter. Dead. ...Ok there is more than one way to skin a cat...I'll trace it with my test light...I pull out the test light. Dead. I couldn't win today....It was stinking hot...so I decided to cut my losses and call it a day.

Saturday, June 13, 2009

This intake pipe blows

Went out this afternoon and rounded up some of the final things needed before I can turn the key...Came home and made the intake pipe. Don't get me started on the fact the NO ONE in this town on a Saturday has mandrel-bent pipe...So, I'm short one 2.5" pipe...which I'll just order..

...and welded up the downpipe and instaled the bung for the O2 sensor.

My activities director (read:wife) has given me the all clear for tomorrow morning...so more updates to come. I hope to get the wastegate welded in place, the fuel pump wired up, and the rest of the hot side welded.

Sunday, June 7, 2009

Making a fuel of myself...

I spent the morning installing the fuel system in the truck. I mounted the regulator and the lines...mounted and added clear sight plugs and a 4.5 power valve to the carb...

Installed the fuel cell and lines...although I have the wrong brackets for the cell...not sure why the tag says 5 gallon??...I'll look into that...

and installed the pump...so that about covers it...Fuel system...check.

Thursday, June 4, 2009

Summit comes through....

Got home today and the missing Summit parts were here already. Wow...that was fast. My wife is out of town this weekend...so no excuses...I'm getting some stuff done...period.

My usual Thursday night at Benson got rained...so here I sit watching a repeat of pass time..I think I'll go to Kroger and get some french fries to cover with chili and cheese...What this has to do with the truck...nothing...but it's raining and I'm hungry.

Tuesday, June 2, 2009

Where's the rest of my parts?

Well I got a box from Summit today....opened it up and about half the stuff was missing...I looked at the label...package 1 of 1...Check the packing slip...says it all shipped....wtf?...

So, I called Summit...they got the info about what was missing and said they'll send it out...then he asked "Was the tape clear?"...I said "yeah."...He says "Oh they've been in that box...we only use brown tape UPS has retaped it. We'll file a claim with them.". Anyway...now I have to wait a few more days for the rest of the fittings for the fuel system and oil drain...damn.

I did get my fittings for the carb from Quick Fuel...and bought a 8 foot braided line off ebay...this (and the missing Summit stuff) should complete the fuel system...now if I can just get some dry days to get some work done.

Wednesday, May 20, 2009

Wastegating away in Budweiserville...

Got some more stuff done tonight...I got the pipes cut, mocked up and ready for welding to install the wastegate.

...and made the turn from the downpipe.

So, I think one more weldapalooza the hot side will be done. Then on to the cold side and fuel system install...there's a rise in my levis...I'm getting close to turning the key....aw, who am I kidding...I'm probably still weeks away...levis back to normal...

Monday, May 18, 2009

Lookin' hot...lookin' damn hot!*

Well, I scooted out of work today with the intension of getting the yard mowed and getting some of the downpipe done...well 1 out of 2 aint bad...I'm guessing that band clamp is not gonna cut it..so just using it till I figure out something else (I should be using a v-band but I'm cheap and trying to avoid it...welding is free...right?)

* Name that movie.

Friday, May 8, 2009

...and the girls tell me 4" isn't big.

All my 4" down pipe stuff arrived today..it looks ginormous next to the 2.5" stuff I've been dealing with. mandrel-bends.com rocks...no one sells pipe this this cheap.

Hopefully I can clear out some time tomorrow to get some of it in place....cause Sunday's mothers day...I'm gonna guess there will be no work that day...

Saturday, May 2, 2009

It's getting hot in here...

I got the hot side feed all mocked up. I also bought the piping for the wastgate so that is coming up as soon as the downpipe stuff arives(as I am going to run the wastegate dump into the downpipe).

FYI - it's an anomoly in the photo that makes it appear that the pipe is sitting right on the control arm...it's not. There are several inches of clearance for movement.

Wednesday, April 29, 2009

This is getting exhausting....

Ok, I have more crap on the way...all my 4" stuff for the down pipe as well as the turbo feed line and drain flange...

I'll mark those off my shoping list.

Saturday, April 11, 2009

Hi, my name is Holley...Blow Me!

(WARNING: long post.) My Holley 600 Double Pumper got the the blow-thru treatment today. I'm not really a carb wizard this is based on the hanger 18 mods (which has a much more detailed explaination of what I'm doing here) I started with a stock 600DP that I bought on ebay.

Disassembly. Removed the float bowls, removed the metering blocks, separated the body, removed the sqirters, and turned it upside down to get put the small check valve. Removed the accelerator pumps and springs. This has the old style with the check ball in the acc pump so I left that alone. Removed the needle and seats as well as the jets and the brass floats. This has vent extensions so I removed them as well. I also removed the idle adjustment screws and the cork gaskets. I then ran a file over the main body where the metering blocks mount to knock down any high spots. I went through with a razor blade and scraped down all the gasket surfaces clean.

Not necessary for blow-thru but helpful for tuning I took a file and knocked off the ridge on the vacuum port. This allows the bowl to be removed more easily for jet changes.

This is one of the big mods with a blow-thru...I drilled the PVCR (Power Valve Channel Restrictors) to .0650 The idea is this...when the power valve opens it allows more fuel into the main well...increasing the size of the PVCR allows you to richen up only under boost (when the power valve is open) and lets you run a smaller jet for cruise conditions. .0650 is only slighty larger than stock which is about .0590...but I can always go up if need be. The tape around the drill bit is so I accidentally do drill too far

...Here is the finished product. The metering blocks, float bowls, and other misc small parts then went for a soak in carb cleaner...The main body and base plate got a good scrub down with a soft brush and carb cleaner ...and then all got a blow dry with compressed air.

Next up Nitrophyl floats and jet extensions. Because with a blow-thru you are pressurizing the float bowls you cannot run standard brass floats...they will crush under the pressure. So, I added Nitrophyl floats which are solid and will not crush. The rear also got jet extensions as well...they come with a special notched float to fit over the extensions. These are so that under acceleration when the fuel sloshes to the back of the bowl it doesn't uncover the jets leaving you lean...not a good thing in a turbo car.

Bigger needle and seats. A blow thru can go through a lot of fuel...and the fuel system must keep up...this includes filling the float bowls...I added .120 needle and seats to allow more fuel into the bowls keeping them full under high demand conditions.

Power valve. Nothing fancy here...just a standard 6.5 power valve. We'll see how this works come tuning time I know a lot of blow thrus use something lower like a 4.5. [Edit: I ended up going with 4.5 to start with...]

The rest of the reassembly. Here are the metering blocks all ready to go back in...new jets, PV, needle and seats, and gaskets. I took a shot in the dark for jetting...I put in 74/84 as a baseline...I figure at least it should not be lean with this to start.

Next since the choke horn has been removed from this carb I have to block off the hole where the rod used to come through as this would cause a boost leak. I small chunk of the JB Weld Stick worked great.

That is it. Here it is reassembled. I'm still gonna run some epoxy over the tops of the metering bocks where the plugs are just for extra insurance so that the boost won't blow them out...but otherwise I'm ready for a blow.

Friday, April 10, 2009

I mounted my turbo...and didn't even buy it dinner.

I finished up the turbo mount today. I got the support rods made and the center cut out to fit the flange I had made previously. I mocked it all up and it fits pretty well...maybe just a little trimming to clear the drain flange...but for the most part done.

Casualties of war..

Some days it just goes this way...

While working on finishing up the turbo mount...I burned up my 4" angle grinder...dead, finished, gonzo. It was a cheap-o that I have abused for a couple of years so no big loss.

...Next the air compressor started making a strange noise..I went and investigated an it had broke the feed line...it was 5/16 copper and of course neither Lowes nor Home Depot carries it...But my boys at Loop Road Auto Parts came through...they had a steel 5/16 and the compression fittings (although I don't get a warm-fuzzy from 120psi and compression fitings)...I came home repaired the line on the compressor and back to work...


So while finishing up some holes for the rods I had made, the drill jambed and bit the big one...another one on its way to the great power tool graveyard...

This must be a record for me...breaking three power tools in one day.

Tuesday, April 7, 2009

Fuel system almost there....

Well, my fuel cell arrived today...and I ordered (most of) the rest of the fuel system...including the cell brackets, Mallory 4309 regulator, hard lines, and fittings. I also remembered to order the missing bracket for my quarter stick. I'm still gonna be shy a filter, and some braided lines to the carb

Since my boy is way into drag racing at the moment I also have (as he calls it) a "ready, steady, go light" (Christmas tree) clock coming for him.

Sunday, April 5, 2009

Dictionary.

Squat [skwat] –noun Slang. (usually used in the negative)
1. A minimum amount or degree; the least bit.
2. The amount of work I got done on the truck this weekend.

So, no carb build, no finishing the support rods, nada, zip,...squat. Yard work all damn day...

Friday, April 3, 2009

Carb build coming up....

I went out tonight and bought the drill bit I need for drilling the PVCR (Power Valve Channel Restrictors) in the carb...So, I have everything I need now. I will be doing the tear down Sunday...and maybe reassembley...depending on how long I soak stuff...Stay tuned.

Wednesday, April 1, 2009

Fuel Cell

Snagged a fuel cell on ebay tonight...an RCI brand new for $67...sweet...I can mark that off my Shopping List